Almost all transmission and gearbox components have been completed. Next comes the assembly of these components and then the virtual construction of the entire CoaX manned 20’ aircraft.

Almost all transmission and gearbox components have been completed. Next comes the assembly of these components and then the virtual construction of the entire CoaX manned 20’ aircraft.